top of page

How to Get a Granite Quarry License in India in 2025: A Complete Guide

Oct 3

4 min read

3

16

India’s granite industry continues to hold strong importance for domestic construction, exports, and employment. But licensing — and ensuring compliance — is more complex than ever. Recent law changes, state policy updates, and regulatory clarifications mean it’s critical to stay up-to-date before you invest in a quarry.

This guide takes you through everything you need to know in 2025 to secure a legal granite quarry license, and to operate legally thereafter.




Who Can Apply & Who Needs What

  • Eligible Applicants: Indian citizens, companies, LLPs. For foreign investment, joint ventures may be possible, but subject to FDI rules and environmental / mining restrictions.

  • Different Licenses / Leases / Permissions:

    1. Prospecting License (if needed) — to explore or survey geological potential.

    2. Mining Lease / Quarry License — for actual extraction.

    3. Environmental Clearance (EC) — especially if the size or production capacity is over thresholds.

    4. Forest Clearance — if the quarry or mining is in or affects forest land. Recent rule amendments (e.g. under the Forest (Conservation) Rules) are intended to simplify aspects, especially for critical or strategic minerals. Business Standard+1

    5. Consent/NOC from Pollution Control Board.

    6. Other state-specific minor minerals / quarry rules.


License / Permission

Purpose

Notes & Recent Changes

Prospecting / Exploration (if required)

Surveying and assessing the site

Some states waive this for minor mineral quarries

Mining Lease / Quarry Licence

Legal right to extract granite

Duration & renewal vary by state

Environmental Clearance (EC)

To assess ecological impact

Mandatory above certain thresholds; public hearing may be needed

Forest Clearance

If quarrying affects forest land

New rules (2024/2025) may streamline parts of this

Pollution Control Board Consent / NOC

Ensure emissions, dust & wastewater are controlled

Required in most states

Land use / conversion & revenue records

If the land is agricultural, need conversion

Key cause of rejection in many applications

Local / Panchayat / Zonal NOCs

Community, tribal, local government clearances

Particularly in remote or tribal land areas

District Mineral Foundation (DMF) registration

Contribution / fund for local development

Required by central mining rules

4. Step‑by‑Step Process to Get a Granite Quarry License in 2025

Here’s a structured process you can follow, incorporating the latest rules.

Step 1: Identify Site & Conduct Preliminary Surveys

  • Find a potential quarry site (private land or government land). Check land use classification, forest/reserve status, whether the land is reserved, etc.

  • Conduct geological survey / mapping. If you or your state require a prospecting license or exploration license, get that sorted.

  • Check for existing infra: road access, water, power, etc.

Step 2: Check Applicable Laws & Clearances for Your State

  • Which minor/major mineral rules apply in your state? (Different states have different rules for minor minerals which often include building stone / granite).

  • Determine if forest clearance or wildlife / ecological impact assessments are required.

  • Check local zoning, land conversion requirements, revenue records.

Step 3: Collect & Prepare Documentation

You’ll typically need:

  • Title deeds or lease agreement

  • Proof of applicant identity / company registration

  • Geological Report / Survey Data

  • Map of site, coordinates, topographic plan

  • Mining Plan (prepared by a qualified expert)

  • Environmental Impact Assessment (if required) + public hearing documentation

  • Forest clearance documents (if applicable)

  • Pollution Control Board consents

  • Any other state-specific permissions

Step 4: Submit Application / Bid (if via Auction)

  • If your state requires e‑auction or tender for leases of minor minerals (including granite), follow that process. Eg: Tamil Nadu has moved to e‑auction for quarry leases for minor minerals. The Times of India

  • For direct lease/license applications, submit to the Mines & Geology or DMG (Department of Mines and Geology) in your state.

Step 5: Inspection, Hearing & Approval

  • The authority inspects the site for feasibility, environmental watershed, forest/wildlife impact, impact on local community.

  • Public hearing might be required for EC (especially under EIA processes).

  • If all in order, quarry license / mining lease is granted. The tenure (validity) and extension rights must be understood (this varies widely by state).

Step 6: Post-License Compliance & Operationalization

  • Pay royalty, seigniorage, DMF (District Mineral Foundation) funds, etc.

  • Follow environmental safeguards: waste management, dust suppression, water table protection, rehabilitation of land, afforestation.

  • Safety norms: worker safety equipment, site marking, etc.

  • Periodic reporting: production, environmental performance, audits.

5. Costs, Timeline & Challenges in 2025

  • Timeframe: Depending on the state and complexity, could take from 6‑12 months or more, especially if forest clearance or public hearings are involved. Online application systems are helping reduce delays in some states.

  • Costs: Geological survey and mining plan preparation fees, consultant fees, application / processing fees, royalty/security deposits, environmental assessment fees, land or lease cost, possibly land conversion if agricultural land.

  • Challenges:

    • Delays in obtaining forest / environmental clearance.

    • Variability across states in rules, royalty, tenure.

    • Retrospective liabilities (royalties/taxes) resulting from court rulings.

    • Disputes over land ownership or land use.

    • Ensuring compliance to safety / environmental norms, or risk penalties.

6. State‑Specific Notes (Examples)

  • Rajasthan: New mineral and M‑Sand policies (2024) have been integrated into Minor Mineral Concession Rules. Policy aims to streamline leases, auctions and transparency. The Times of India

  • Tamil Nadu: Use of e‑auction for quarry leases for minor minerals including granite. The Times of India

  • Karnataka: As of Feb 2025, plan to set up an R&D center for granite mining in Chamarajanagar, concerns around high royalty rates being raised by the industry. The New Indian Express

7. Best Practices to Ensure Smooth Licensing in 2025

  • Engage consultants early who are familiar with your state’s mining, environmental, forest laws.

  • Maintain transparency and documentation especially in environmental assessment, land ownership, revenue/royalty payments.

  • Anticipate regulatory changes: monitor policy changes at central and state governments, e.g. any amendment in MMDR Act, forest conservation rules, critical mineral policies.

  • Community & stakeholder engagement: public hearings, local panchayat, tribal welfare committees when applicable.

8. Conclusion

The opportunity in granite quarrying remains strong in India in 2025, but the legal landscape is evolving. To succeed, you must:

  • Stay updated with both central laws (MMDR Act, forest law, environmental law) and state rules (minor mineral concession rules, royalty rates, lease terms).

  • Prepare robust documentation, follow regulatory processes carefully.

  • Be proactive about environmental, safety, and social compliance.

If you do that, you’ll reduce risks, avoid delays and legal trouble, and position your quarry project for sustainable success.



Oct 3

4 min read

3

16

bottom of page